Set-Up Reduction - SMED (Single Minute Exchange of Die)

(for Dutch version: click HERE)

Basic Course - 1 day

VAN GOUBERGEN P&M gcv conducts SMED IN HOUSE trainings for its customers. This basic course gives to the participants a complete overview of the SMED method for set-up reduction, as well as an integrated approach for a set-up reduction project, in which additional Industrial Engineering tools are used to increase the effectivity of the SMED method. The different elements of the SMED method for set-up reduction will be illustrated with several practical examples on video.

Advantages of Set-Up Reduction

  • Reduction of change-over costs
  • Production of smaller lotsizes combined with an increased number of change-overs
  • Trial-runs are minimized or even become superfluous
  • Urgent orders can be quickly produced
  • Improved productivity (increased efficiency, less waste, less machinedefects)
  • Set-Up becomes easy, no special skills are needed
  • Reduction or elimination of intermediate inventory
  • Improved flexibility
  • Reduction of inventory costs

Participants

This training is a basic course for a broad audience. Possible participants are:

  • Operators - Machine-setters
  • Groupleaders, teamleaders, supervisors, foremen
  • Technical and maintenance personnel
  • Employees of supporting services
    • Industrial Engineers
    • R&D
    • Purchase Department
    • Marketing, Sales
    • Quality Departement
    • Equipment Engineering and construction
    • Process Engineers
    • etc.

 

Program

  • Why Set-Up Reduction?
  • The SMED-Method (Single Minute Exchange of Die)
  • Introduction of the SMED-Method in Practice
  • Global Industrial Engineering Approach for Set-Up Reduction
  • Set-Up Reduction as an Organization-wide Problem
  • Examples of the SMED-principles in different practical situations


2000-2005 © Van Goubergen P&M. All rights reserved.